"Giruno" highspeed train (maximum velocity 250 km/h/155 mph) RABe 501 # 016 of the SBB, built by StadlerRail in a series of 29, is leaving the 57 kilometer long, world record, Gotthard Base Tunnel... (more)
Re 460 # 108 of the SBB is pulling the Intercity 882 (a push pull train with standard cars type IV) from Lugano to ZĂ¼rich, between Castione-Arbedo and Claro.